1. Basic Principle of Pick-to-Zero
Pick-to-zero means:
There is no permanent safety or cycle stock in the warehouse.
Supplier orders are generated based on aggregated demand.
After goods arrive at the DC, distribution to stores is recalculated.
Distribution aims to balance coverage (in days of sales), rather than repeating the original calculation.
This fundamentally differs from cross-docking.
2. Order Calendar Transformation
Standard Mode (Non-Pick-to-Zero)
In the standard model:
Each store has its own order calendar (e.g., Mon, Wed, Fri).
Orders are strictly generated on these days.
The DC functions as a buffer.
Pick-to-Zero Mode
When pick-to-zero is activated, the calendar is transformed:
Store orders are no longer generated according to their usual schedule.
The system creates a single order per week (or per supplier cycle).
This order is synchronized with the supplier’s arrival date at the DC.
3. Synchronization Mechanism
Example:
Supplier delivers to DC: Tuesday
DC ships to stores: Monday, Wednesday, Friday
Delivery to store occurs the following day
System behavior:
On Monday, a supplier order is generated.
On Tuesday, goods arrive at the DC.
On the same day, store orders are recalculated:
Monday’s sales are considered
Forecast is updated
Matrix changes are applied
Goods are allocated to stores.
Shipment occurs in the next outbound slot (e.g., Wednesday).
Stores receive goods on Thursday.
4. Why Other Order Days Are Disabled
Since the warehouse does not maintain stock:
Warehouse stock outside the supplier’s delivery date = 0
Additional store orders would be unfulfillable
Therefore, other order days are suppressed
This is not a UI restriction but a system-level calendar transformation logic.
5. Algorithmic Distribution Logic
Key point: redistribution occurs after goods arrive, not based on the original Monday calculation.
Difference from Cross-Dock
Cross-Dock:
Store orders are calculated on Monday
Aggregated and sent to the supplier
Incoming volume is distributed strictly according to Monday’s matrix
No recalculation
Pick-to-Zero:
Supplier order is sent on Monday
After arrival on Tuesday:
Store demand is recalculated
Actual stock (D1) is considered
Updated forecast (D1D2) is applied
Coverage is then balanced
Goal: Minimize variance in Days of Sales between stores.
If total new demand ≠ incoming volume, distribution is optimized for balanced coverage.
6. Demand Calculation Logic
The recalculation uses the standard formula:
Demand = Forecast D1D2 + Safety Stock + Presentation – Stock D1
However:
Safety Stock is not added again for additional cycles
Shelf-life constraints are applied normally
Max SD may limit final coverage
7. Key Configuration Requirements
For correct pick-to-zero operation, it is necessary to:
Properly configure the supplier delivery calendar
Verify the warehouse outbound calendar
Ensure SKUs are marked as pick-to-zero
Confirm that no active warehouse safety stock exists
Check the priority of constraints (Shelf term → Max SD → Waste limit)
8. Summary Table
Stage | Cross-Dock | Pick-to-Zero |
|---|---|---|
Store Order Calculation | Before arrival | After arrival |
Recalculation after inbound | No | Yes |
Distribution | Fixed | Optimizable |
Orders per week | Per store calendar | 1 (per supplier cycle) |
Warehouse Stock | Possible | 0 outside inbound |
If needed, I can also provide:
SQL logic for calendar transformation
Sequence of calls in
rpm_units.jsCase analysis for additional cycles (+D1D2) in pick-to-zero