Additional Cycle in an Order and the +D1D2 Parameter
Sometimes a standard order for one delivery cycle is not enough. For example, a business may want to order less frequently but immediately cover the need for several subsequent cycles.
For this, MySales uses Additional Cycle. It extends the order quantity further into the future, while the +D1 / +D1D2 parameters additionally extend the Forecast horizon within each cycle.
As a result, the system can generate a single order that takes into account not only the current cycle but also the forecast of future need.
What Is Additional Cycle
Additional Cycle determines how many subsequent cycles should have their Forecast additionally taken into account if the basic need for an order has already arisen.
In simple terms:
If a product already needs to be ordered, MySales can immediately add the forecast for one or several subsequent cycles to the order.
Its logic is similar to the Min/Max approach:
the basic need serves as a replenishment signal;
after it arises, the system increases stock to a level that covers additional cycles;
the required level is determined not by a static norm but by the Forecast of future demand.
Basic Calculation Without an Additional Cycle
For one cycle, the need can be represented as follows:
Need = D1D2 Forecast + Safety Stock + Presentation Stock − D1 Stock
There are then two possible scenarios:
if
Need ≤ 0— no order is generated;if
Need > 0— a need for an order arises.
It is the positive basic need that triggers the logic of additional cycles.
How Additional Cycle Works
Additional Cycle = 1
First, MySales calculates the standard need.
If: Need > 0
the D1D2 Forecast of the next cycle is added to it.
In simplified form: Order = current need + forecast for the next cycle
or in more detail: Order = D1D2 Forecast of the current cycle + Safety Stock + Presentation Stock − D1 Stock + D1D2 Forecast of the next cycle
Important
Safety Stock is added only once.
It is not duplicated for each additional cycle.
Additional Cycle = 2, 3, and More
If, for example:
Additional Cycle = 2
the Forecast of two subsequent cycles is added to the order.
In this case:
Safety Stock is still taken into account only once;
the basic check
Need > 0is performed once at the beginning;if the basic need has not arisen, additional cycles do not trigger an order on their own.
In simplified form:
Order = basic need + Forecast Cycle 2 + Forecast Cycle 3 + ...
Therefore, the parameter determines not when an order arises but the depth of future demand that needs to be added after it arises.
How +D1 / +D1D2 Works
The +D1 and +D1D2 parameters extend the Forecast horizon by additional days.
For example, if the standard D1D2 covers a certain period, and:
+D1D2 = 2 days
the system additionally includes the Forecast for two more days.
This allows the order coverage horizon to be increased without changing the delivery schedule itself.
How +D1D2 Combines with Additional Cycles
The key feature:
+D1D2 applies not only to the current cycle but also to each additional cycle.
That is, if one cycle uses:
D1D2 Forecast + 2 additional days
the same extended horizon is also used for the subsequent cycles added through the Additional Cycle parameter.
In simplified form:
Current cycle + +D1D2
↓
Additional cycle 1 + +D1D2
↓
Additional cycle 2 + +D1D2
↓
Final order
Thus, +D1D2 amplifies the effect of the additional cycle, since each cycle covers a larger forecast horizon.
Calculation Example
Assume:
D1D2 Forecast =
10;+D1D2 =
2 days;after extending the horizon, Forecast =
14;Safety Stock =
5;D1 Stock =
6;Presentation Stock =
0;Additional Cycle =
1.
1. Check the Basic Need
Need = 14 + 5 − 6 = 13
Since: 13 > 0
an order needs to be generated.
2. Add the Next Cycle
The next cycle also uses the Forecast taking +D1D2 into account:
Forecast of the next cycle = 14
Then: Order = 14 + 5 − 6 + 14
Order = 27
Therefore:
Final order = 27 units.
Safety Stock 5 is taken into account only once.
If Additional Cycle = 2
The Forecast of one more cycle is added to the previous calculation:
27 + 14 = 41
Therefore:
Order = 41
In this case, Safety Stock is not added again.
Full Process Logic
Calculation of the basic need
↓
Need > 0?
↓
Yes
↓
Forecast of the current cycle
↓
+D1 / +D1D2
↓
Forecast of additional cycles
↓
+D1 / +D1D2 for each of them
↓
Safety Stock is added once
↓
Final order
If the basic need ≤ 0, the additional cycle does not activate an order on its own.
What Is Important to Remember
Additional Cycle:
adds the Forecast of subsequent cycles;
works only if the basic need is positive;
can cover one or several subsequent cycles;
does not duplicate Safety Stock for each cycle.
+D1 / +D1D2:
extend the forecast horizon;
add additional days of Forecast;
also apply to additional cycles;
increase the total period covered by the order.
Together, these parameters make it possible to manage not only the replenishment frequency but also the stock horizon that the system creates with a single order.
When This Is Useful
Additional cycles together with +D1D2 can be useful when it is necessary to:
reduce the frequency of deliveries;
reduce the operational workload on the distribution centre or supplier;
create a larger stock with a single order;
cover future need for several cycles;
bring the replenishment logic closer to Min/Max, while using Forecast instead of static norms.
At the same time, a larger coverage horizon also means a larger potential stock, so it is advisable to use these settings together with other MySales constraints that control the allowable stock level.
Result
Additional Cycle answers the question:
“For how many subsequent cycles should demand be taken into account immediately?”
and +D1D2:
“How many additional days of Forecast should be included in each of these cycles?”